Hydraulic telescopic container spreader
Telescopic container spreader part | ||
Carrying capacity | 41Tons | |
Material | Q345B ;Q345B or better | |
Self-weight | ~ 14.5T | |
Twist-lock Open/Close mode | Droved by motor | |
range | 20ft-45ft | |
Expansion time (20'to 45') | ~ 35 S | |
Main ELC. system | Siemens & Schneider | |
Twist lock rotation 90° | ~ 1.5 S | |
Total Power | ~11 KW | |
Adjust center mode | ±600 mm | |
Environmental condition | Temperature ≤50ºC, Humidity ≤90% | |
Max detection | Limit sensors | |
Connect mode | Pin and Shaft Connections | |
Lubricating mode | Self-lubricating and lubricating grease | |
Sheet lifter control | Bridge control console | |
Data of container | Specification | 20ft 40ft 45ft |
Weight | MAX. 41Tons | |
Rotary hook group part | ||
Carrying capacity | 45Tons | |
Material | Q345B | |
Hook Material | DG20Mn | |
Self-weight | ~ 2.15T | |
Rotation mode | Droved by motor | |
Rotation time | 1 r/min | |
Main ELC. system | Siemens & Schneider | |
Total Power | ~ 2.2 KW | |
Environmental condition | Temperature ≤50ºC, Humidity ≤90% | |
Classification group | M6 | |
Connect mode | Pin and Shaft Connections | |
Lubricating mode | Self-lubricating and lubricating grease | |
Sheet lifter control | Bridge control console |
Quality - Safe & Reliable
We insurance the quality are safe and reliable of the container spreader.
1.Self-own factory & Engineering designer
So that we can control each step of the production container spreadedr .
2.Six Sigma Quality Control Policy
Our factory produce the container spreader is according to the standard of Six Sigma.
3. 50+years of in fabrication of the container spreader
The container spreader has high safety requirements. The container spreader in our factory has double protection, electronic protection and mechanical protection to ensure the safety of the container spreader.
More than 50 years of production also ensures safety
Price - Best Price with Best Quality
In the case of the same configuration, our price will be cheaper.
Rationalization of the production process, to a certain extent, save labor costs, save materials.
Overall planning of raw material procurement, reduce raw material cost.
So we can offer a more competitive price.
Certificate
Exhibition